Rigeons Quay, Halesworth

We were able to refute the Environment Agency's insistence that the number of units proposed in this scheme should drop because of flood risk concerns.

We achieved this by accurately modelling a section of the River Blythe which included a weir and a bifurcation of the channel.

Our model confirmed that the scheme as proposed would not flood in the design event and a planning consent was achieved.

Rigeons Quay Halesworth