Bridges & Retaining Walls – Bridge Inspections

Client: MOD

Project manager: Cyril Orchard Group

Value: ongoing

Currently ongoing are a series of bridge inspections and assessments being completed at various locations across the UK on behalf of the MOD. The works are being completed on some of their numerous training bases to check the capacity and residual life of their bridge stock to insure that they are able to continue to support their ever growing array of vehicles.

Due to our experience in this area having completed similar works for Network Rail, Local Councils, the Environment Agency as well as numerous private organisations, we are not only able to provide detailed comment upon the load carrying capacity of the wide variety of structures present, but also advise as to any remedial works that may be required to either restore the capacities required, or at worst prolong the residual life as far as possible to allow a strategy for replacement to be instigated.