Ports and Marina – Shoebury Garrison Gogs Berth

The project was to design the temporary works for a water discharge at Shoebury Garrison. The works included the assessment of an existing reinforced concrete channel culvert, design a permanent H-pile foundation to support a new pre-cast culvert system.

Our solution took into account the many site constraints which included working within tidal envelopes and maintaining flows through the existing culvert discharge. Our final design was detailed in close connection with input from the contractor to ensure that a safe and efficient solution was delivered.